|
|
||
|
|
Capital Improvement Plan
Each year the Sewer Authority updates the Capital Improvement Plan (CIP) to schedule future developments to the sewer system and infrastructure throughout the sewer service area.
The CIP is a 5 year plan outlining the necessary upgrades needed for infrastructure construction and reconstruction. These improvements will be valuable in providing the Authority with necessary tools needed to promote community growth and development. In this section, we highlight some recent upgrades to our infrastructure. The Sewer Authority has put together the following presentation, which shows several improvements we have made. Please click here to download this presentation, in PDF form: THE BOROUGH OF CONSHOHOCKEN AUTHORITY CAPITAL IMPROVEMENT PLAN.pdf A Survey and Repair of Sewer Lines: Before and After Repairs These PDF documents and the video below detail a repair which was done to a sewer line on Forrest St. between W.5th and W.6th Ave. The document linked here is a survey created on August 12, 2008 showing areas requiring repair: 377-363_2008.08.12.913_ReportPackage.PDF This document is a survey created on February 23, 2011 showing the same areas after they were repaired: 377-363_2011.02.23.1055_ReportPackage.PDF This video shows a comparison of the damaged areas, and the repairs, from the video camera used to inspect the inside of the sewer pipe. |
CURRENTS 2013 Meeting Schedule The Borough of Conshohocken Authority’s will hold its regular monthly meetings on: January 17 February 21 March 21 April 18 May 16 June 20 July 18 August 15 September 19 October 17 November 21 December 19 All meetings are held at the Authority Office at 601 E. Elm St. Conshohocken. Meeting time is 6:30 PM. New: Click to view Meeting Minutes for 2010, 2011 and 2012 |
|
Page content reviewed and published: 1/20/2012 11:28:02 AM
Borough of Conshohocken Authority
© 2013 Borough of Conshohocken Authority All rights reserved. Terms |